THE INTELLIGENCE LAYER FOR COOLING

In development & validation

Cooling intelligence.Clearer decisions.

We’re building AI that helps teams understand cooling systems, evaluate better operating choices and measure what changes, using the equipment they already have.

Read-only first. Operators stay in control.

The intelligence layer for cooling A conceptual cooling system with a building load, two chillers, pumps and cooling towers connected to the TARA intelligence layer. TARA Intelligence layer Building load Cooling towers Chillers Pumps Cold supply Warm return
THE CONNECTED COOLING PLANT · CONCEPTUAL VIEW

Cyan: cold supply  ·  Amber: warm return

01   Understand the whole plant02   Review the operating choice03   Make the evidence visible

THE CHALLENGE

Your equipment is connected.
Its decisions should be, too.

Cooling is a system. But the information needed to run it often lives in separate places.

  • 01
    Data without the full picture.Signals need equipment context, operating limits and quality checks.
  • 02
    Trade-offs across the plant.A change at one chiller can affect pumps, towers and service elsewhere.
  • 03
    Improvement needs evidence.Lower electricity use means little if the required cooling is not delivered.

FROM SIGNAL TO UNDERSTANDING

A clearer path from
plant data to decisions.

One connected workflow. Five jobs. Built around the people responsible for the plant.

01 / CONNECT & CONTEXT

Give every signal a place.

Bring equipment, meter readings, drawings and operating limits into one plant model. Identify what is known, what is missing and which data can support a decision.

A clearer picture of your plant.

PLANT CONTEXT

Equipment & connectionsMap
Meter readings & unitsCheck
Operating constraintsRecord

Illustrative workflow · In development

THE FOUNDATION

Understand the system.

Plant context and physics-informed models connect equipment, behaviour and constraints.

Explore the foundation
TARA

Make it useful.

The proposed operator workflow turns observations into explanations and reviewable choices.

Meet the workflow
THE EVIDENCE

Show what changed.

Trace a result to its inputs, assumptions, operating conditions and agreed comparison.

See the principles

FOCUSED FIRST. EXPAND WITH EVIDENCE.

A shared ambition.
A qualified scope.

Every application has a service to protect. New domains need their own validation.

First validation focus

Buildings &
central plants.

Water-cooled central chilled-water plants in noncritical offices, hotels and campuses.

Protect comfort, humidity and occupied-hour service.

Explore plant fit
Future qualification

Manufacturing &
process cooling.

Food, beverage and pharmaceutical cooling utilities, subject to process-specific assessment.

Protect temperature, throughput and product quality.

View the direction
Later roadmap

Data centres &
critical loads.

A separately qualified scope for demanding cooling and reliability requirements.

Protect thermal limits, redundancy and uptime.

View the direction

TRUST IS A DESIGN REQUIREMENT

Intelligence above.
Authority at the plant.

Our intended architecture keeps AI proposals separate from permission to act. Local controls remain authoritative.

Explore safety & evidence
  • Start by observing.

    Qualify data and understand the plant before considering an operating change. Read-only access is the starting point.

  • Respect explicit boundaries.

    Future commands require site-approved limits, valid inputs and commissioned interfaces. Existing BAS, PLC and equipment protections stay in place.

  • Make decisions traceable.

    Record assumptions, permissions, applied states and outcomes. Show uncertainty rather than hiding it behind a confident answer.

THE DEVELOPMENT PATH

Each capability
has to earn its place.

A staged programme, with evidence gates before each expansion in scope.

Phase 01

Qualify & connect.

Map one plant archetype. Agree data rights. Establish measurement quality and useful questions.

FOUNDATION DEVELOPMENT
Phase 02

Forecast & recommend.

Test models against relevant baselines. Make observations and choices reviewable.

VALIDATION REQUIRED
Phase 03

Supervise within limits.

Commission selected actions only after permission, safety and operating gates pass.

CONDITIONAL CAPABILITY
Phase 04

Learn & transfer.

Evaluate reuse across different plants and qualify new applications on their own evidence.

LONG-TERM GOAL

CLEAR ANSWERS

Start with
the essentials.

Still have a plant-specific question?

Speak with the team
What does Net0link do?

We are building a cooling-intelligence layer that connects plant data with engineering context. The goal is to help teams understand system behaviour, evaluate operating choices and verify outcomes through TARA workflows.

Does it replace our BMS or equipment?

The intended architecture works above existing building management systems (BMS), programmable logic controllers (PLC) and equipment controls. Site compatibility and data access must be assessed; existing protective logic remains authoritative.

Will AI control the plant on its own?

The development approach starts read-only. Recommendations are a separate capability. Any future supervised action requires site-approved limits, commissioning and a clear authorisation path. A language model does not directly command equipment.

Which sites are the first focus?

Noncritical buildings with water-cooled central chilled-water plants are the first validation domain. Offices, hotels and campuses may be candidates depending on their plant configuration, metering, documentation and operator participation.

How will savings be verified?

A site-specific evaluation must agree the measurement boundary, adjusted baseline, uncertainty and required service quality. This website does not present a verified Cooling Foundation savings percentage or guarantee.

What about manufacturing and data centres?

Food, beverage and pharmaceutical process cooling are future areas requiring separate qualification. Data centres are a later roadmap domain, with additional thermal, redundancy and uptime requirements.

Can plant data be used to train shared models?

Access to operational data does not automatically grant training rights. Permitted use, confidentiality and any shared learning must be explicitly agreed.

How can we get involved?

Start with a plant-fit conversation. Tell us the type of plant, the information you have and the operating question you want to investigate. The Cooling Foundation is in development and validation; a conversation does not commit you to deployment.

BUILD WITH US

The next chapter of cooling
starts with a real plant.

Help shape the intelligence your operations actually need. Let’s start with your system, your constraints and the decision you want to improve.